HomeServicesContactClient ListHow Deep?Photos
Air Excavation SetupPotholing for the Santa Fe Railrunner ExtensionVacmasters 4000 Air Excavation TruckVacmasters 4000 Air Excavation TruckLowering Anode into 28 foot deep hole. Approximately 50 minutes to dig without damaging conflicting utilities.28 foot holeCobble 4 to 5 inches in diameterTubes connected for 26 foot deep Anode hole.Hole with Anode bag. No shoring 26 foot depth28 feet deepTruck finishing anode holeCompleted shoring system 5 hours Vacuum timeExcavation with shoring system inside trench box. Between pipe & drain vault. San Juan Chama Water line.Excavating with water & vacuum around valve operator stand pipes. Total vacuum lift 38 feetRaw waterline valve excavation shoring systemTruck and Vacuum tube adjacent to shoring systemTrench box around pipe shoring systemExposed valvesLocating water pipe at 16 feet below fencePipe locatedBackfilling pothole with excavated materialTruck dump ing excavated material into potholeEvacuating hole for soldier beam shoring system14 feet deep hole adjacent to fence for shoring systemVacuuming new shaft for elevator replacement inside buildingSlot trenching around lost utilities1300 feet of slot trenching at 4.5 foot depthSlot TrenchingSlot trench with water lance and vacuum tube